the conventional luminaires replaced by ArenaVision LED in less than four months. The project scope included wiring, steel construction and commissioning, and luminaire aiming and programming. One of the biggest challenges in the project was also to construct a new CATWALK in order to be able to install the new fixture on time.”
- Juan Pablo Pasture, Systems Engineering Manager, Dubai Systems Center