Description
The 1st stage has been divided into some sub-stages, because first of all the older hall consisted of two smaller separate halls connected in the proces of expansion, so it was not perfectly linked building, that is why the project was very demanding.
The other tough aspect was that we had to adapt to prevailing conditions, because there have already been production lines.
Major tasks:
- Audit of existing lightining installation
- Simulation of new PHILIPS luminaires in Dialux
- Electrical Project
- Complete deinstallation of old electrical installation
- New electrical installation, which included executive project, new control cabinet and new cable routes.
- Commissioning of automotion control