    Changi Airport Terminal 4


    Singapore

    The brand new terminal 4 at award-winning Changi Airport had to both cutting edge in concept & herald a new less manpower intensive design as a test bed for the future Mega Terminal 5.  
    Control Tech Asia was chosen to design, specify & then supply the complete Philips Dynalite system for the "most advanced airport terminal in the world"! 

    Design objectives of this project

    To maximize the use of seamless technology to minimize manpower. Quality lighting control with multiple levels of interfacing to other third part intelligent systems to allow the project owner maximum flexibility whilst minimizing energy usage.

     

    Impact on end user

    The flexibility that works seamlessly with both old world replicas & ultra modern parts of the terminal. Interfacing with BMS, FIDS (Flight Information Display System, allowing a schedule change to plane to reflect in lighting settings at the gate lounge & fixed gangways) & centralized (for 4 terminals) scheduler, making it a truly integrated system. 

    Featured products

    Dynalite DDBC516DALI
    Dynalite DUS360CR
    Dynalite 78 DUS704W
    Dynalite DDRC420FR
    Dynalite DNG485 Bridges

    Project team


    Value Added Partner: Control Tech Asia Pte Ltd.

    Lighting Designer: LichtVision.Architectsof Berlin with localization by Vision Lighting (WSP Group)

    Client: Changi Airport Group

    Installation date: Completion 31st October 2017, Inaugurated August 3rd 2018