Matagarup Pedestrian Bridge


Perth - Western Australia

The Matagarup Pedestrian Bridge was built to provide a direct pedestrian link between the city center of Perth in Western Australia, across the Swan River to the new multipurpose 60,000 seat Optus Stadium and the public parks around it. The bridges modern design reflects the serpentine sweeping curves of the river and its illumination was an essential element to complement the bridge every night of the year, not just on event days at the stadium.

The original architectural design of the bridge, was that the bridges framing was to be completely enclosed in a translucent skin, at the last moment, an architectural change to leave the steel structure exposed called for the rapid reworking of the lighting and control design by the local Signify partner Light Application and ultimately to an unapologetically bold architectural expression that needed equally visually bold illumination to match the nearby Optus stadium’s total LED fit-out also by Signify and Color Kinetics.  

 

Standing an impressive 65 meters tall, the 400m wide bridge is required to illuminate to an ever-changing yearly calendar of community event days colors and interactive animations, Interact Landmark was successfully utilized to provide control, scheduling and monitoring of the bridge and is being extended out to other Government projects around the City of Perth including the new Optus Stadium. 

 

The public appreciation of the bridge was immediate, as it provides a great amenity, access and ever-changing visual interactivity with the river and the sports precincts parks and gardens both at night and by day. 

 

The design objectives and requirements were to have the visual striking illumination of the structure of the bridge, high energy efficiency and extremely low ongoing maintenance requirement along with very long service life. The other main design element was the fully featured remote control, scheduling, and interactivity, ensuring the visual repertoire of the bridge is always changing and visually refreshed.


This project has been one of the most technically difficult constructions ever undertaken in Western Australia and the local workforce has embraced the challenge and done an outstanding job.
 To all the workers, in design, fabrication and illumination,along with the many that worked on site, I congratulate and thank them for all of their efforts."

Rita Saffioti

Transport Minister for the West Australian Government

Featured products

Philips Dynalite Controller Pharos LPC  
Philips Color Kinetics Color Graze MX4RGBW
Philips Lumec Roadstar
Interact Landmark software control platform 

Project team

 

Value Added Partner: Light Application

Lighting Designer: Light Application

Client: York Rizzani JV for the State Government of Western Australia

Installing Electrical Contractor: Stiles Electrical

Installation date: April 2018